Blast-furnace production

Project

Client

Year

Blast-furnace automation integration complex OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2009-2011
ACS « Tapping schedule of blast-furnaces » OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2008
Supervisory control automated system for rail transportation control center on Blast-furnace station OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2008
Automated control system for molten materials and liquid iron and slag transportation OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2007-2009
ACS « State visualization of blast-furnaces on web-mimic panels in a blast furnace- factory and the master control room of OJSC «Iron and Steel Works» OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2007
ACS «Keeping track of the torpedo ladle at the location «blast-furnace factory – oxygen-converter plant» OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2007
An automated system «Blast furnace- factory electronic report» OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2007
ACS TP aggregates integration of every blast-furnace in AIS CCR(central control room) of the plant, ACS «Energouchet»(«Power record») and ACS «Proisvodstvo»(«production») OJSC Magnitogorsk Iron and Steel Works. Blast-furnace factory 2006, 2007, 2008, 2009